The FIFA Fan Festival™ Kansas City was the region’s official, free public gathering place during the FIFA World Cup 2026™, hosted on the south lawn of the National WWI Museum and Memorial. It’s the city’s front porch to the world, drawing local residents, international fans, and families across an 18-day run in front of a global audience of 1.7 billion viewers.
The Kansas City Tourism Board needed a structural production partner who could design, engineer, and build the physical backbone of the entire festival footprint. That included a 17-day build window, protected historic grounds, and a multi-vendor production model with no room to step out of bounds.



Studio Blue served as the structural production partner for the festival, engineering and building the physical backbone within a 17-day window on land that carries National Historic Landmark status, where nothing could be built, anchored, or removed without meeting federal preservation requirements.
The complexity wasn’t actually the size of the build. It was coordinating that build while separate audio, video, lighting, and LED teams each ran their own operations on the same grounds and the same schedule.
Studio Blue kept the structural and staging systems synced and on track throughout, serving as the foundation the rest of the production depended on.
The visual and structural centerpiece of the festival, where every match broadcast reached the crowd.
The city’s symbol of openness and community spirit, built to stand 65 feet tall, showing just how big Kansas City’s heart was while welcoming attendees.
Extended sightlines and screens across the grounds, giving fans standing well beyond the stage the same view and audio experience as those up front.
Housed the operational core of the festival, the infrastructure that let Studio Blue coordinate seamlessly with vendors pre-chosen by the Kansas City Tourism Board.


Kansas City, structures up to 65 feet tall, and tens of thousands of attendees per day. And it was all happening during tornado season.
But designing for safety was right up Studio Blue’s (tornado) alley. Structures were engineered with wind tolerance, and the contingency plan was a stamped High Wind Action Plan from a structural engineer, tailor-made based on Kansas City’s weather history.
Two days into the festival a severe storm rolled through with wind gusts reaching 75 miles per hour and a tornado within 10 miles.
The plan was put into action. The crew lowered every structure to a safer height ahead of the storm, then brought them back to full height once it passed.
The result: zero damage, no overtime, and no scrambling for replacement parts. All of Studio Blue’s built-structures were intact.